Calculators
Construction calculators
Quick sums for civil jobs, with the working shown so you can check it.
Volume and weight
Cubic metres to tonnes
Convert a volume to a weight, or a weight back to a volume.
Bulking factor
Convert a volume in the ground to a loose volume, or back.
Compaction factor
Work out the loose volume to order for a compacted volume, or back.
Truckloads
Work out how many loads it takes to shift a volume or a tonnage.
Material coverage
Work out the area a tonne covers at a depth, or the tonnes for an area.
Earthworks and trenching
Excavation volume
Work out the volume of a hole with vertical or battered sides, in the ground and loose.
Trench volume and backfill
Work out the trench volume, the backfill around a pipe and the spoil left over.
Stockpile volume
Work out the volume and tonnes in a conical stockpile or a windrow.
Slope and batter
Convert a slope or batter between a ratio, a percent grade and degrees.
Pipe fall and grade
Work out a pipe’s fall from its grade, or its grade from the fall, and the invert levels.
Material quantities
Concrete volume
Work out the concrete for a slab, a strip footing or round piers, and the volume to order.
Road base and gravel
Work out the tonnes and loose cubic metres of road base or gravel to order.
Asphalt tonnage
Work out the tonnes of asphalt for an area and thickness.
Topsoil and mulch
Work out the cubic metres of topsoil or mulch for an area, and the tonnes.
Stabilisation binder
Work out the tonnes of binder and the spread rate for in-situ stabilisation.
Spray seal quantity
Work out the binder litres and aggregate for a spray seal from your design rates.
Reinforcing mesh sheets
Work out the number of mesh sheets for a slab, laid out with laps.
Plant and haulage
Plant hire rate
Work out an hourly hire rate for a machine from what it costs to own and run.
Haul cycle and truck numbers
Work out the truck cycle time and how many trucks keep the loader busy.
Excavator production rate
Work out the cubic metres an hour and per shift an excavator digs and loads.
Haulage cost per tonne
Work out what cartage costs per load, per tonne and per cubic metre.
Fuel use and cost
Work out the litres of fuel a machine uses and what it costs.
Plant utilisation
Work out how much of the time a machine was available it actually worked.
Rates and commercial
Dayworks rate
Work out a dayworks charge for labour, plant and materials from your own costs.
Labour charge-out rate
Work out what to charge per hour for a worker, from the wage up.
Markup and margin
Work out a sell price, or convert between markup and margin.
Progress claim and retention
Work out this claim’s amount after retention and earlier claims.
Timesheet hours
Work out the hours worked from start and finish times, less breaks.
Production rate
Work out the production rate so far and how long the rest will take.
Forecast cost at completion
Work out a job’s forecast final cost, its variance to budget and the margin.
Reference tables
Material densities and bulking factors
Typical densities, bulking and compaction factors for civil materials, with sources.
Test turnaround times
How long common soil, pavement and concrete tests take to come back.
Request a calculator
Missing the one you need?
Tell us what you want to work out on site or in the office. We use these requests to decide what to build next.
Thanks, we have your request
Your request helps us decide which calculators to add next.
Site-proof civil software
See how Varicon would work on your jobs
Show us how your crew and office work today. We will show you how hours, dockets and variations flow through to payroll, claims and job costs.