Skip to content

Topsoil and mulch calculator

m²

mm

The depth you spread it to.

t/m³

Optional. Loose tonnes per cubic metre, for the weight. Pick a material or enter your supplier’s figure.

%

For settling, uneven ground and spillage. Adjust it to suit the job, or enter 0 for none.

Volume to order

21 m³

Working: 200 m² × 100 mm ÷ 1,000 × (1 + 5%) = 21 m³

This is an estimate. Topsoil settles and mulch breaks down after it is spread, so set the waste allowance to suit the job and check your supplier’s figures.

How to calculate topsoil and mulch volume

Volume to order = area × depth × (1 + waste allowance)

Multiply the area by the depth. Convert the depth from millimetres to metres by dividing by 1,000. Then add the waste allowance. That gives the cubic metres to order, since topsoil and mulch are sold loose.

For the weight, multiply the volume to order by the loose density of the material.

Worked example. An area of 200 m², spread 100 mm deep, with a 5% waste allowance. 100 mm is 0.1 m, so 200 × 0.1 = 20 m³. 20 × 1.05 = 21 m³ to order.

The 5% is an example figure.

What this assumes

  • The material is spread to the same depth across the whole area.
  • The volume is loose, as delivered. The waste allowance covers settling, uneven ground and spillage.

How Varicon helps

Check the topsoil delivered against the area to cover

The calculator gives the cubic metres and tonnes. Varicon captures each delivery docket on site and costs it to the job when it arrives, not when the supplier invoice turns up.

Delivery dockets captured on site

Your crew captures each delivery docket on a phone as the load arrives, with any supporting documents.

Delivery dockets

Deliveries in the site diary

Material deliveries come from the dockets captured on site, so each day on record shows what arrived.

Site diary

Actual cost against budget

Compare actual cost against budget by cost centre, resource type or accounting code.

Cost management