Glossary
Civil construction terms, explained plainly
What the words on your dockets, claims and reports mean, and how each one works on a civil job.
Terms A to Z
Bank guarantee
A bank guarantee is a promise from a contractor’s bank to pay the client up to a set amount if the contractor does not meet its obligations under the contract. It is given as security for the work.
Cost code
A cost code is a label for a part of a job, such as bulk earthworks or drainage, that costs are allocated to, so you can compare actual cost with the budget for that part of the job.
Dayworks docket
A dayworks docket records the labour, equipment and materials used for work that is not covered by the original contract, so the extra work can be tracked, approved and billed.
Delivery docket
A delivery docket is the document that comes with a delivery of goods or materials to site, showing what was delivered, how much and when. Signed on receipt, it is your evidence of what arrived.
Earned value
Earned value compares the budgeted value of the work actually done with what that work cost and with what was planned to be done by now, to show whether a job is over or under budget and ahead or behind.
Enterprise bargaining agreement
An enterprise bargaining agreement (EBA) is a collective agreement made at an enterprise level between an employer and its employees about their terms and conditions of employment.
Forecast cost to complete
Forecast cost to complete (FCTC) is the expected final cost of a project, worked out from what has been spent so far and the remaining quantities and unit rates.
Inspection and test plan
An inspection and test plan (ITP) lists the inspections and tests a piece of work needs, when they happen, what the acceptance criteria are and who signs each one off.
Kiosk mode
Kiosk mode lets a crew share one tablet at the site office to log their hours and complete forms, without each worker installing an app on their own phone.
Margin erosion
Margin erosion is the gradual loss of the profit margin on a job, as costs creep above what the price allowed for, often in small amounts that are not noticed until the job is finished.
Prestart
A prestart is a check done before work starts. An equipment prestart confirms a machine has been inspected and is safe to use. A daily prestart runs through the day’s work with the crew before they start.
Production tracking
Production tracking measures how much work is done on each task, as quantities or percentage complete, and compares the actual cost per unit with the budget.
Progress claim
A progress claim is a contractor’s request for payment for the work completed in a period, measured against the contract schedule and any approved variations.
Purchase order
A purchase order (PO) is the document a buyer sends a supplier or subcontractor to order goods or services. It sets out what is ordered, the quantity, the price, delivery and the terms.
Retention
Retention is a portion of each progress payment that the client holds back as security until the work is complete and any defects are fixed.
Site diary
A site diary is a daily record of what happened on a construction site: the weather, the work done, the people and plant on site, deliveries, safety matters and anything that changed.
SWMS
A safe work method statement (SWMS) sets out the safe way to do a specific task: the hazards involved, the controls for each one and how the work will be done.
Three-way match
A three-way match checks a supplier bill against the purchase order and the delivery docket before it is paid, so you only pay for what was ordered, at the agreed rate, and what actually arrived.
Timesheet
A timesheet records the hours each worker spends on each job, with start and finish times, breaks and any allowances, so they can be paid and the labour can be costed to the job.
Toolbox talk
A toolbox talk is a short safety meeting with the crew on site, usually before work starts, about a specific hazard, task or recent incident.
Variation
A variation is a change to the scope of work in a contract, such as extra work, less work or different work. The contractor records it and claims it so the contract price is adjusted.
WIP report
A work in progress (WIP) report shows, for each job that is still running, the costs and claims to date against the contract value and the forecast final cost, so you can see where each job stands.
Work breakdown structure
A work breakdown structure (WBS) splits a project into a hierarchy of smaller pieces of work, so each piece can be budgeted, tracked and costed.
Site-proof civil software
See how it all connects in Varicon
Hours, dockets and variations your crew logs on site flow through to payroll, claims and job costs, so you can see where you stand on every job.