Skip to content

Glossary

What is a toolbox talk?

A toolbox talk is a short safety meeting with the crew on site, usually before work starts, about a specific hazard, task or recent incident.

Also known as: Toolbox meeting.

Running a toolbox talk

Keep it short and about the work in front of the crew: a task coming up, a hazard on site or something that went wrong recently. Give the crew a chance to raise their own concerns.

What to record

  • The date, the site and who ran it.
  • The topics covered.
  • Who attended, with their signatures.
  • Any actions agreed and who is doing them.

How Varicon helps

Toolbox talks recorded on site, not written up later

Varicon will not run the talk for you. It gives you a toolbox talk template in the form builder, your crew records the topics, attendees and signatures on a phone or a tablet, and the office sees the record once it is submitted.

A toolbox talk template

Start from the toolbox talk template and edit the fields to suit your sites.

Construction forms

Attendees from your lists

Dropdowns pull from your employees and projects in Varicon, so names are not typed in again.

Construction forms

Signed by everyone there

A form takes several signatures, so everyone at the talk can sign on one device, and it records where it was filled in.

Construction forms

  • Template

    Plant prestart checklist template

    A prestart checklist for one machine and one shift, with walk-around, cab, fluid and attachment checks, faults found and sign-off.

    Free download: Excel, Word and PDF

  • Template

    SWMS template

    A safe work method statement with high risk work, PPE, plant and qualifications, then job steps, hazards, controls, risk ratings and worker sign-on.

    Free download: Excel, Word and PDF

  • Guide

    Site diaries and forms that hold up

    Record the day on the day, use the same forms on every job and get them to the office as soon as they are done. Good site records back up your claims, variations and safety records, and digital ones are easier to keep.

  • Glossary

    Prestart

    A prestart is a check done before work starts. An equipment prestart confirms a machine has been inspected and is safe to use. A daily prestart runs through the day’s work with the crew before they start.

  • Glossary

    SWMS

    A safe work method statement (SWMS) sets out the safe way to do a specific task: the hazards involved, the controls for each one and how the work will be done.

  • Article

    Product release: digital custom forms for civil construction

    Varicon custom forms for civil contractors: ten forms to take off paper, from prestarts to SWMS, and ten features of the drag and drop form builder.

Site-proof civil software

See how Varicon would work on your jobs

Show us how your crew and office work today. We will show you how hours, dockets and variations flow through to payroll, claims and job costs.