Skip to content

Glossary

What is a prestart?

A prestart is a check done before work starts. An equipment prestart confirms a machine has been inspected and is safe to use. A daily prestart runs through the day’s work with the crew before they start.

Also known as: Pre-start, Prestart check.

Equipment prestarts

The operator inspects the machine against a checklist before using it and records the result. Anything that fails the check is reported before the machine is used.

Daily prestarts

A daily prestart uses a standard checklist so the same things are covered every day before work begins, such as the tasks, the hazards and who is doing what.

Keeping the records

A prestart only counts if there is a record of it. Paper prestart books are easy to skip, hard to read and slow to reach the office. A digital form can be made compulsory, recorded with the date, time and location, and seen in the office as soon as it is submitted.

How Varicon helps

Prestarts your crew completes on a phone before work starts

In Varicon a prestart is a form. Build equipment and daily prestarts in the form builder, your crew fills them in on a phone or a tablet before they start, and the office sees each one once it is submitted.

Your prestart, your fields

Build equipment prestarts with checkboxes, dropdowns, signatures and tables, without code.

Construction forms

Linked to your equipment list

Dropdowns pull from your lists in Varicon, such as employees, projects and equipment, and each form records where it was filled in.

Construction forms

Describe it and check it

Type what you need, such as a daily prestart checklist, and Varicon builds the form for you to check and edit.

Construction forms

  • Template

    Plant prestart checklist template

    A prestart checklist for one machine and one shift, with walk-around, cab, fluid and attachment checks, faults found and sign-off.

    Free download: Excel, Word and PDF

  • Template

    SWMS template

    A safe work method statement with high risk work, PPE, plant and qualifications, then job steps, hazards, controls, risk ratings and worker sign-on.

    Free download: Excel, Word and PDF

  • Guide

    Site diaries and forms that hold up

    Record the day on the day, use the same forms on every job and get them to the office as soon as they are done. Good site records back up your claims, variations and safety records, and digital ones are easier to keep.

  • Glossary

    Toolbox talk

    A toolbox talk is a short safety meeting with the crew on site, usually before work starts, about a specific hazard, task or recent incident.

  • Glossary

    SWMS

    A safe work method statement (SWMS) sets out the safe way to do a specific task: the hazards involved, the controls for each one and how the work will be done.

  • Article

    Product release: digital custom forms for civil construction

    Varicon custom forms for civil contractors: ten forms to take off paper, from prestarts to SWMS, and ten features of the drag and drop form builder.

Site-proof civil software

See how Varicon would work on your jobs

Show us how your crew and office work today. We will show you how hours, dockets and variations flow through to payroll, claims and job costs.