Skip to content

Glossary

What is a SWMS?

A safe work method statement (SWMS) sets out the safe way to do a specific task: the hazards involved, the controls for each one and how the work will be done.

Also known as: Safe work method statement.

How a SWMS is used

A SWMS is written for a task, such as working near live traffic or in a trench. It lists the steps of the work, the hazards at each step and the controls that deal with them, along with emergency procedures. The crew doing the task reads it and signs it before they start, and it is reviewed when the task or the site conditions change.

Which tasks need a SWMS and what it must contain depend on the work health and safety rules where you work. Check those with your safety adviser.

How Varicon helps

A SWMS your crew reads and signs on a phone

Varicon does not write your SWMS or tell you which tasks need one. That is for your safety adviser. What it gives you is a SWMS template in the form builder to edit to suit, signed on a phone or a tablet and seen by the office once submitted.

A SWMS template to start from

Start from the SWMS template and edit the steps, hazards and controls to suit your work.

Construction forms

Signed on site

Your crew completes and signs the form on a phone or a tablet, with the location recorded.

Construction forms

Sent to the right people

Route each submitted SWMS to the people who need it, and set auto-approvals where they fit.

Construction forms

  • Template

    SWMS template

    A safe work method statement with high risk work, PPE, plant and qualifications, then job steps, hazards, controls, risk ratings and worker sign-on.

    Free download: Excel, Word and PDF

  • Guide

    Site diaries and forms that hold up

    Record the day on the day, use the same forms on every job and get them to the office as soon as they are done. Good site records back up your claims, variations and safety records, and digital ones are easier to keep.

  • Glossary

    Prestart

    A prestart is a check done before work starts. An equipment prestart confirms a machine has been inspected and is safe to use. A daily prestart runs through the day’s work with the crew before they start.

  • Glossary

    Toolbox talk

    A toolbox talk is a short safety meeting with the crew on site, usually before work starts, about a specific hazard, task or recent incident.

  • Article

    Product release: digital custom forms for civil construction

    Varicon custom forms for civil contractors: ten forms to take off paper, from prestarts to SWMS, and ten features of the drag and drop form builder.

Site-proof civil software

See how Varicon would work on your jobs

Show us how your crew and office work today. We will show you how hours, dockets and variations flow through to payroll, claims and job costs.