Site diaries and forms that hold up

Record the day on the day, use the same forms on every job and get them to the office as soon as they are done. Good site records back up your claims, variations and safety records, and digital ones are easier to keep.

Published
Reading time
2 min read
A submitted excavator prestart in the Varicon web app with panels for response notifications, submission status, location and who the form is assigned to

The records a civil job runs on

Most civil jobs need some or all of these:

  • a daily site diary
  • equipment prestarts and daily prestarts
  • toolbox talks and safety meetings
  • safe work method statements (SWMS)
  • site inductions for new workers
  • incident and near miss reports
  • QA inspection checklists and inspection and test plans
  • safety audits
  • site requests for resources, permits or approvals
  • HR forms, such as leave requests.

Why paper records let you down

Paper forms get messy, lost and filled in late. They are hard to track, and someone in the office has to read them and type them into another system. The details that matter most in a dispute, a variation or an incident investigation are often the ones missing.

Step 1: write the site diary on the day

The site diary is the history of the job. Record the weather, the work done, labour and plant hours, deliveries, subcontractors, safety matters and anything that changed from the plans or the scope. Be specific, and add photos, docket numbers and names, so an entry is easy to check later.

Step 2: use the same form for the same job

Standard forms mean the same things are checked every time, on every site. Set up your prestarts, toolbox talks, SWMS and inspections once, and assign each form to the projects, people or equipment it applies to.

Step 3: make the essential forms compulsory

Decide which forms must be done before work starts, such as a daily prestart, and make them required. Tying them to timesheets means they are done as part of the crew’s day, not chased afterwards.

Step 4: capture who, where and when

Record signatures, with several on one form for meetings such as toolbox talks. Record the location, date and time of every submission, so there is an audit trail behind each one.

Step 5: get forms to the right people

Send completed forms to the people who need to act on them. Set notifications for answers that need follow-up, such as a failed prestart or a reported hazard.

Step 6: keep records easy to find

Group forms with tags so they are quick to find, and keep them with the job. Be able to produce a PDF of any submission when a client, an auditor or a regulator asks.

How Varicon helps

Site diaries and forms recorded on the day, in one place

This guide says to record the day on the day, use the same form every time and get it to the office quickly. In Varicon your supervisor fills in the diary on site, your crew uses the same forms on every job, and both reach the office once submitted.

A diary that starts filled in

Hours from timesheets and materials from delivery dockets are already in the diary, so your supervisor adds the rest.

Site diary

The same form on every job

Start from a SWMS, toolbox talk or site inspection template, or build your own without code, and use it on every job with the location recorded.

Construction forms

Dayworks from the record

A supervisor turns the crew, plant and materials in the diary into a dayworks docket for client sign-off.

Dayworks dockets

  • Preview of the daily site diary template, with job details, morning and afternoon weather, work performed, labour, plant, materials, subcontractors, delays, safety and sign-off

    Daily site diary template

    A one-page daily diary for a civil job, with weather, work performed, labour, plant, materials, subcontractors, delays and safety.

    Free download: Excel, Word and PDF

  • Preview of the plant prestart checklist template, with machine and operator details, walk-around, in the cab, fluid level and attachment checks, faults found and sign-off

    Plant prestart checklist template

    A prestart checklist for one machine and one shift, with walk-around, cab, fluid and attachment checks, faults found and sign-off.

    Free download: Excel, Word and PDF

  • Preview of the first page of the SWMS template, with statement details, high risk construction work to tick, PPE, plant and qualifications, emergency and consultation sections

    SWMS template

    A safe work method statement with high risk work, PPE, plant and qualifications, then job steps, hazards, controls, risk ratings and worker sign-on.

    Free download: Excel, Word and PDF

Site-proof civil software

See how Varicon would work on your jobs

Show us how your crew and office work today. We will show you how hours, dockets and variations flow through to payroll, claims and job costs.