Practical guides for running civil jobs

How to get hours to payroll, claims paid, supplier bills checked and job costs under control, step by step, with examples from civil jobs.

Choose a guide

  • Laptop showing a project forecast in the Varicon web app beside a phone showing the timesheet screen of the mobile app

    Guide

    Choosing software your crew will actually use

    Choose software built for civil work that connects site and office and that your crew will actually use. Then roll it out in stages, starting with one part such as timesheets, with real help to set it up.

  • A Civil Force excavator tipping gravel onto a lined drainage bed on site

    Guide

    Managing job costs on civil construction projects

    Break each job into cost codes, capture labour, plant and materials against them every day, count supplier costs when the goods arrive, claim every variation, and use what each job teaches you in your next tender.

  • A submitted excavator prestart in the Varicon web app with panels for response notifications, submission status, location and who the form is assigned to

    Guide

    Site diaries and forms that hold up

    Record the day on the day, use the same forms on every job and get them to the office as soon as they are done. Good site records back up your claims, variations and safety records, and digital ones are easier to keep.

  • Two pages of a Varicon progress claim PDF with claimant, client and project details and a claim summary table

    Guide

    Getting progress claims and variations paid

    Agree how work will be measured and approved before the job starts, keep site records that back up every claim and variation, and submit complete claims on time.

  • A worker in hi-vis in front of a large orange excavator on an urban site beside a motorway overpass

    Guide

    Purchase orders and supplier bills for civil contractors

    Put each order in writing with a purchase order, check every delivery against its docket, and match each supplier bill to both before you pay it. Start simple, and add approvals as the business grows.

  • Varicon timesheet approval list in the web app beside the timesheet list in the mobile app

    Guide

    From site timesheets to payroll without the retyping

    Capture hours on site as the work happens, have a supervisor approve them once, then send approved hours to payroll in your accounting system, with pay rules set up by employment type.