What is a dayworks docket?

A dayworks docket records the labour, equipment and materials used for work that is not covered by the original contract, so the extra work can be tracked, approved and billed.

Also known as: Daywork docket.

What goes on a dayworks docket

A docket lists the people, plant and materials used on the extra work, usually for one day. Each item is charged at the rates agreed with the client, often set out in a dayworks schedule. Listing resources exactly as they appear in that schedule makes the docket easier to check and invoice, and leaves less room for disputes.

Who approves it

The client’s representative checks and signs the docket. That can happen on site, on the operator’s or supervisor’s device, or later by email. Once approved, the docket is the evidence behind the dayworks claim.

How Varicon helps

Create dayworks dockets from the hours your crew already logs

In Varicon a dayworks docket is built from an operator’s timesheet or from the site diary, signed by your client on site or by email, and costed at the rates in your client’s dayworks schedule.

From a timesheet or the diary

An operator creates a docket from their own timesheet, or a supervisor compiles the whole crew’s day from the site diary.

Dayworks dockets

Client sign-off

Your client representative signs on the device on site, or approves the docket by email.

Dayworks dockets

Your client’s rates

A resource charge sheet maps your workers, equipment and materials to your client’s agreed rates, so the claim amount is calculated as the docket is created.

Dayworks dockets

  • Template

    Dayworks docket template

    A docket for work done on day rates, with the instruction, labour, plant and equipment, materials, and sign-off by client and contractor.

    Free download: Excel, Word and PDF

  • Glossary

    Variation

    A variation is a change to the scope of work in a contract, such as extra work, less work or different work. The contractor records it and claims it so the contract price is adjusted.

  • Glossary

    Site diary

    A site diary is a daily record of what happened on a construction site: the weather, the work done, the people and plant on site, deliveries, safety matters and anything that changed.

  • Glossary

    Timesheet

    A timesheet records the hours each worker spends on each job, with start and finish times, breaks and any allowances, so they can be paid and the labour can be costed to the job.

  • Article

    Mastering construction dayworks: best practices to save time and claim every hour

    Best practices for managing construction dayworks, from setting rates and recording dockets on site to getting approved and paid sooner.

  • Article

    5 civil construction tips to streamline your progress claims and variation claims

    Five civil construction tips to streamline your progress claims and variation claims, so you get paid fairly and on time for the work you do.

Site-proof civil software

See how Varicon would work on your jobs

Show us how your crew and office work today. We will show you how hours, dockets and variations flow through to payroll, claims and job costs.