Dayworks rate calculator
Dayworks total
- Labour cost per hour
- Labour charge rate
- Labour
- Plant charge rate
- Plant
- Materials
Working:
Enter at least one of these to see the result:
- Labour base hourly cost
- Plant hourly cost
- Materials cost
ResultEnter at least one figure to see the result.
This is an estimate from your own rates. Your contract’s dayworks schedule sets what can be charged, so check the result against it.
How to calculate a dayworks rate
Dayworks = labour cost per hour × (1 + markup %) × hours + plant cost × (1 + markup %) × hours + materials × (1 + markup %)
Dayworks are charged as cost plus a markup, part by part. This calculator works out each part, then adds them up.
- Labour. Cost per hour = base hourly cost × (1 + on-costs % ÷ 100) + other on-costs per hour, where the on-costs % is superannuation or KiwiSaver, leave, workers compensation or ACC, and payroll tax added together. Charge rate = cost per hour × (1 + markup % ÷ 100). Labour = charge rate × hours.
- Plant. Charge rate = hourly cost × (1 + markup % ÷ 100). Plant = charge rate × hours.
- Materials. Materials = cost × (1 + markup % ÷ 100).
Worked example, in words. A labour markup of 10% on top of on-costs of 30% does not add up to 40%. It is 1.3 × 1.1 = 1.43, so the charge rate is 43% above the base cost. Plant and materials have one markup each, so a 10% markup is 10% above cost.
Many contracts set the dayworks rates, on-costs and markups in a schedule. Use your contract’s figures where it has them. Every dollar and percentage field starts empty.
What this assumes
- Fill in labour, plant, materials or any mix. A part counts once any of its fields is filled in, and then needs all of them, apart from payroll tax and other on-costs.
- Every labour on-cost percentage is taken on the base cost. No award, agreement or tax rule is applied.
- Every markup is added to cost. Enter 0 for a part with no markup.
- GST is not included.
How Varicon helps
Set the rates once, then get each docket signed off
Once your dayworks rates are agreed, Varicon holds them in a resource charge sheet. Your crew raises dockets from timesheets or the site diary, and your client signs off on site or by email.
- Your rates on every docket
A resource charge sheet maps your workers, equipment and materials to the rates agreed with your client.
- Dockets from the site diary
A supervisor can compile the day’s crew, plant and materials from the site diary into one dayworks docket.
- Signed on site or by email
Your client signs on the device on site or approves by email, and the claim amount is calculated as dockets are created.