Skip to content

Plant hire rate calculator

Owning costs
$

$

What you expect to sell it for at the end of its life with you.

years

How many years you expect to keep it.

h/year

The working hours you expect to charge or cost it for, not the hours it is on site.

%

Optional. Your borrowing rate, or the return you expect on the money tied up in the machine.

$/year

Optional. The total for a year.

Operating costs
L/h

Optional. Leave fuel blank if the hirer pays for it.

$/L

$/h

Servicing, repairs and parts, as a cost per working hour. Enter 0 if you leave it out.

$/h

Optional. Tyres or undercarriage, and ground engaging tools such as teeth and cutting edges.

Hire rate
Hire type

Wet hire includes an operator.

%

Your business overheads, as a percentage added to cost. Enter 0 to leave them out.

%

Added to cost after overhead. A 10% markup on a cost of 100 gives 110.

h/day

Optional. The hours you charge for a day, for the daily rate.

Enter these to see the result:

  • Purchase price
  • Residual value
  • Life
  • Hours worked a year
  • Maintenance and repairs
  • Overhead
  • Markup on cost

This is an estimate from your own figures. Real costs move with how hard the machine works, resale prices and fuel, so check it against your plant records.

How to calculate a plant hire rate

Hire rate = (owning + operating + operator) per hour × (1 + overhead %) × (1 + markup %)

A hire rate has to cover what the machine costs to own, what it costs to run, and your overheads and profit. This calculator works each one out per working hour, from your own figures.

Owning costs are the costs you carry whether the machine works or not.

  • Depreciation is the purchase price less the residual value, spread over its life: (purchase price − residual value) ÷ (life in years × hours worked a year).
  • Finance is the cost of the money tied up in the machine. It is worked out on the average investment over its life, (purchase price + residual value) ÷ 2, times your rate, then divided by the hours worked a year.
  • Insurance and registration for a year, divided by the hours worked a year.

Operating costs are the costs of each hour it runs: fuel use × fuel price, maintenance and repairs, and tyres, tracks and wear parts. For wet hire, the operator’s cost per hour is added.

The total cost per hour then has your overhead added, then your markup.

Worked example, in words. Halve the hours a machine works each year and its depreciation, finance and insurance per hour double, while fuel and maintenance per hour stay the same. That is why the hours worked a year matter as much as the purchase price, and why a machine that sits idle needs a higher rate to pay its way.

Every dollar and percentage field starts empty. Use your own purchase prices, rates and running costs, not typical figures.

What this assumes

  • The machine loses value in a straight line over its life, spread evenly over the hours it works each year.
  • Finance is charged on the average investment, taken as (purchase price + residual value) ÷ 2.
  • Overhead and markup are both added to cost. Markup is not the same as margin on the sell price.
  • Nothing is added for travel, float, minimum hire periods or standing time.

How Varicon helps

Track where each machine works and what it costs

A hire rate covers owning and running the machine. Varicon records which job each machine works on and puts plant costs on the job, so you can check the rate against the work.

Plant on one calendar

Assign plant, crews and subcontractors to jobs on one calendar, and spot double bookings before they reach site.

Crew and equipment scheduling

Machine picked at clock-in

Operators pick the project and the equipment for each shift when they clock in.

Timesheets and payroll

Plant costs on the job

Plant recorded in the site diary flows into the job’s costs, ready to compare with the budget.

Cost management