Plant utilisation calculator

h

The hours it could have worked in the period, for example 5 days × 10 hours.

h

From the hour meter, telematics or timesheets.

h

Optional. The hours you charged to a client or costed to a job.

$/h

Optional. What the machine costs you per hour, for the cost of idle time.

Utilisation

76%

Idle hours
12 h

Working: 38 h ÷ 50 h = 76%

This is an estimate from the hours you enter. Hour meters, telematics and timesheets rarely agree exactly, so use the same source each period.

How to calculate plant utilisation

Utilisation = hours worked ÷ hours available × 100

Utilisation is the share of the available time a machine actually worked.

  • Utilisation = hours worked ÷ hours available × 100.
  • Idle hours = hours available − hours worked.
  • Cost of idle time = idle hours × hourly cost.
  • Hours charged shows how much of the available time earned money or landed on a job: hours charged ÷ hours available × 100. Hours worked but not charged are hours you paid for and did not recover.

Worked example. A machine available 50 hours in a week worked 38. 38 ÷ 50 × 100 = 76% utilisation, with 12 idle hours.

Pick the hours available to suit the question. Calendar hours show how hard the asset works for its owner. Rostered site hours show how well it is planned on the job.

What this assumes

  • Hours worked cannot be more than the hours available in the same period.
  • Idle time is costed at one hourly rate, whatever caused it.
  • Hours worked but not charged are only shown when the hours worked are more than the hours charged.

How Varicon helps

See where every machine is booked across your jobs

Utilisation shows how much a machine worked. Varicon shows where each machine is booked, flags double bookings and unavailable plant, and records the machine each operator picks when they clock in.

Plant on one calendar

See who and what is available across all your jobs, and drag machines onto the calendar.

Crew and equipment scheduling

Clashes flagged before site

Over-allocations, double-booked equipment and unavailable plant are flagged, so you can fix the plan first.

Crew and equipment scheduling

Machine picked at clock-in

Operators pick the project and the equipment for each shift when they clock in.