What is a cost code?

A cost code is a label for a part of a job, such as bulk earthworks or drainage, that costs are allocated to, so you can compare actual cost with the budget for that part of the job.

Also known as: Cost centre.

Why track by cost code

A job is not one bucket of money. It is a set of smaller pieces of work, each with its own budget, and an overrun in one is hard to make up in another. Allocating costs to cost codes lets you spot an overrun early and fix it while the job is still running.

Setting them up

The level of detail is a trade-off between how useful the feedback is and how long it takes your crew to record. Many civil contractors track at the level of high-level tasks, such as bulk earthworks, drainage, concreting, asphalting and overheads, because that is how the crew already thinks about the work.

Keep the list short, at least to start with. Varicon’s own advice is to aim for 5 to 10 cost codes, depending on the size of the job. Capture costs against them every day and check each one against budget regularly.

For more detail, a work breakdown structure splits the job further.

How Varicon helps

Cost codes that your crew costs to as they log the work

In Varicon cost codes are called cost centres. Hours, site diaries and deliveries are costed to them as your crew logs them, so you can compare actual cost with the budget for each part of the job.

Cost centres, WBS or project level

Choose in your company settings whether costs are tracked by cost centre, the most common choice, by work breakdown structure or at project level.

Cost management

Costed from site

Timesheets, site diaries and delivery dockets from site become cost tracking against the job, without retyping.

Cost management

Actual versus budget by cost centre

Run actual versus budget reports, group the data how you need it and export the report to a spreadsheet.

Reporting and dashboards

  • Guide

    Managing job costs on civil construction projects

    Break each job into cost codes, capture labour, plant and materials against them every day, count supplier costs when the goods arrive, claim every variation, and use what each job teaches you in your next tender.

  • Glossary

    Work breakdown structure

    A work breakdown structure (WBS) splits a project into a hierarchy of smaller pieces of work, so each piece can be budgeted, tracked and costed.

  • Glossary

    Forecast cost to complete

    Forecast cost to complete (FCTC) is the expected final cost of a project, worked out from what has been spent so far and the remaining quantities and unit rates.

  • Glossary

    Margin erosion

    Margin erosion is the gradual loss of the profit margin on a job, as costs creep above what the price allowed for, often in small amounts that are not noticed until the job is finished.

  • Glossary

    Timesheet

    A timesheet records the hours each worker spends on each job, with start and finish times, breaks and any allowances, so they can be paid and the labour can be costed to the job.

  • Article

    Five simple tips for managing civil construction costs in a downturn

    Five simple cost management tips civil contractors can start today: cost centres, committed costs, tender rates, variations and less double entry.

Site-proof civil software

See how Varicon would work on your jobs

Show us how your crew and office work today. We will show you how hours, dockets and variations flow through to payroll, claims and job costs.