What is a work breakdown structure?
A work breakdown structure (WBS) splits a project into a hierarchy of smaller pieces of work, so each piece can be budgeted, tracked and costed.
Also known as: WBS.
How a WBS works
The project sits at the top. Below it are the main parts of the work, and each of those is broken down again until the pieces are small enough to budget and track. Costs, quantities and progress are recorded against the lowest level and roll up to the levels above.
WBS or cost codes
A WBS gives the most detailed picture of where money goes on a job. The trade-off is the effort: every hour, docket and delivery has to be coded to the right piece of work, usually by your crew on site. Many civil contractors find cost codes at the level of high-level tasks give useful feedback with less work on site.