Material densities and bulking factors
| Material | In the ground (t/m³) | Loose (t/m³) | Compacted or placed (t/m³) | Bulking | Compaction factor | Sources |
|---|---|---|---|---|---|---|
| Sand, dry | 1.60 | 1.40 | 1.70 | 15% | 1.20 | |
| Sand, wet | 1.92 | 1.84 | 2.05 | 5% | 1.12 | |
| Topsoil | 1.40 | 1.00 | 1.50 | 45% | 1.50 | |
| Common earth (loam) | 2.001.80 to 2.00 | 1.401.23 to 1.40 | 2.09 | 43%43% to 50% | 1.491.49 to 1.70 | |
| Clay, sandy or silty, dry | 1.551.40 to 1.70 | 1.251.10 to 1.40 | 1.651.50 to 1.80 | 25% | 1.35 | |
| Clay, sandy or silty, wet | 1.751.60 to 1.90 | 1.401.30 to 1.50 | 1.901.70 to 2.10 | 25% | 1.35 | |
| Clay, basaltic, dry | 1.851.70 to 2.00 | 1.301.20 to 1.40 | 2.101.90 to 2.30 | 45% | 1.60 | |
| Clay, basaltic, wet | 2.252.00 to 2.50 | 1.551.40 to 1.70 | 2.452.30 to 2.60 | 45% | 1.60 | |
| Gravel | 2.20 | 1.90 | 2.152.00 to 2.30 | 16% | 1.13 | |
| Gravel, wet | 2.161.97 to 2.43 | 1.951.87 to 2.09 | 2.121.87 to 2.45 | 10%5% to 16% | 1.091.00 to 1.17 | |
| Road base (crushed rock) | 1.70 | 2.402.25 to 2.40 | 1.411.32 to 1.41 | |||
| Aggregate, 10 mm | 1.40 | |||||
| Aggregate, 20 mm | 1.40 | |||||
| Crusher dust | 1.50 | 2.20 | 1.47 | |||
| Recycled crushed concrete, 20 mm and 40 mm | 1.60 | 2.10 | 1.31 | |||
| Rail ballast | 1.48 | |||||
| Sandstone | 2.70 | 1.60 | 2.20 | 70% | 1.40 | |
| Shale | 2.64 | 1.47 | 1.78 | 79% | 1.21 | |
| Limestone | 2.60 | 1.60 | 2.20 | 60% | 1.40 | |
| Basalt (blue metal) | 2.90 | 2.00 | 2.40 | 45% | 1.20 | |
| Granite | 2.60 | 1.60 | 2.20 | 60% | 1.40 | |
| Asphalt, hot mix | 2.36 | |||||
| Asphalt millings (RAP) | 1.66 | |||||
| Concrete, normal weight | 2.40 | |||||
| Cement, GP (bagged) | 1.201.00 to 1.30 | |||||
| Hydrated lime | 0.450.40 to 0.48 | |||||
| Garden mulch | 0.30 | |||||
| Water | 1.00 |
These are typical figures for estimating. Your supplier’s data sheet, your geotechnical report and your own test results come first.
Sources
- 1.Austroads, Guide to Pavement Technology Part 8: Pavement Construction (2009), Table 4.1. Read 17 November 2026.
- 2.US Federal Highway Administration, Federal Lands Project Development and Design Manual, Earthwork design, Exhibit 5.1 A. Read 17 November 2026.
- 3.Landscape Design Institute, Bulking, shrinkage and bulk density information (2022). Read 17 November 2026.
- 4.Australian Native Landscapes, Blue metal 10mm. Read 17 November 2026.
- 5.Australian Native Landscapes, Blue metal 20mm. Read 17 November 2026.
- 6.Mt Carbine Quarries, All products. Read 17 November 2026.
- 7.Engineering ToolBox, Solids densities. Read 17 November 2026.
- 8.Designing Buildings Wiki, Converting between weight and volume for bulk materials. Read 17 November 2026.
- 9.Holcim Australia, Glossary. Read 17 November 2026.
- 10.Cement Australia, FAQs. Read 17 November 2026.
- 11.Engineering ToolBox, Densities of common products. Read 17 November 2026.
- 12.Australian Native Landscapes, Delivery. Read 17 November 2026.
- 13.US Geological Survey, Water Science School, Water density. Read 17 November 2026.
About these figures
Each figure shows a typical value, with the published range under it. The typical value is the one the calculators fill in when you pick a material.
- In the ground is the bank density: the material undisturbed, before it is dug.
- Loose is the material once dug or delivered, on a truck or in a stockpile.
- Compacted or placed is the material compacted in place, or for concrete and water, as placed.
- Bulking is how much bigger the loose volume is than the bank volume, as a percentage.
- Compaction factor is the loose volume divided by the compacted volume.
Where a source gives a loose and a compacted density, the compaction factor is the compacted density divided by the loose density.
Density changes with moisture, grading and the parent rock, so the same product from two quarries can differ. Treat these figures as a starting point and check them against your supplier and your own dockets.
Every figure names the public source it was read from and when. Select a figure in the table to open the matching calculator with it filled in.
How Varicon helps
Keep a record of every load that arrives
These figures help you estimate. Varicon keeps the record of what was delivered: dockets captured on site, matched to the purchase order and the supplier bill.
- Delivery dockets captured on site
Your crew captures each delivery docket on a phone as the load arrives, with any supporting documents.
- Matched to the purchase order
The supplier bill is matched to its purchase order and delivery docket, so you can confirm it is right before you pay.
- Deliveries in the site diary
Material deliveries come from the dockets captured on site, so each day on record shows what arrived.