Compaction factor calculator
The finished volume in place, from the design or your take-off.
The volume delivered or stockpiled, before it is spread and compacted.
Loose volume ÷ compacted volume. 1.3 means 1.3 m³ loose compacts to 1 m³.
Loose volume to order
130 m³
Compacted volume
- Volume lost to compaction
- 23.1%
Working: 100 m³ × 1.3 = 130 m³
Loose volume to order130 m³
This is an estimate. Compaction depends on moisture, grading, layer depth and the compaction spec, so check the factor against your supplier and your test results.
How to calculate compaction factor
Compaction factor = loose m³ ÷ compacted m³; loose m³ to order = compacted m³ × compaction factor
Loose material settles and packs down when it is spread, rolled and compacted. To end up with the compacted volume the job needs, you have to order more loose material than that.
The compaction factor is the loose volume divided by the compacted volume, so it is always 1 or more. To find the loose volume to order, multiply the compacted volume by the compaction factor. To find what a loose volume will compact to, divide it by the factor.
Worked example. You need 100 m³ of compacted material and the compaction factor is 1.3. 100 × 1.3 = 130 m³ loose to order. Going back, 130 m³ ÷ 1.3 = 100 m³ compacted, so about 23.1% of the loose volume is lost to compaction.
The 1.3 is an example figure, not the factor for any particular material. Compaction is not the opposite of bulking: material compacted to spec is often denser than it was in the ground. Use a factor for the material and spec you are working to, from your supplier, the material densities and bulking factors table or your own compaction test results.
What this assumes
- The compaction factor compares the loose volume as delivered with the same material compacted to your spec.
- It does not allow for waste, overfill or material lost at the edges. Add your own allowance for those.
How Varicon helps
Order the fill, then track what arrives and what it costs
The compaction factor tells you how much loose fill to order. Varicon records each load as it arrives and puts the cost on the job, so you can check the order against the budget.
- Every load on a docket
Your crew captures delivery dockets on a phone as the fill arrives, so the office sees what came in without chasing paper.
- Costed to the job on arrival
A delivery docket creates a cost against the job when the delivery arrives, before the supplier invoice.
- Actual cost against budget
Compare actual cost against budget by cost centre, resource type or accounting code.