Pipe fall and grade calculator

Work out
m

The horizontal distance between the two ends, such as pit to pit.

Grade as
%

m

Optional. The level of the inside bottom of the pipe at the high end.

Fall

400 mm

Fall in metres
0.4 m
Grade, 1 in
100
Downstream invert level
24.6 m

Working: 40 m × 1% = 0.4 m. Downstream invert: 25 m − 0.4 m = 24.6 m

The sum is exact. Your design and the minimum grades it calls for come first, so check the levels against the drawings before you lay.

How to calculate pipe fall and grade

Fall = length × grade % ÷ 100, or length ÷ X for a grade of 1 in X

The fall is the length times the grade. With a grade in percent, fall = length × percent ÷ 100. With a grade of 1 in X, fall = length ÷ X.

To find the grade from a fall, divide the fall by the length. In percent, grade = fall ÷ length × 100. As 1 in X, X = length ÷ fall.

The downstream invert level is the upstream invert level less the fall.

Worked example. A 40 m run at a grade of 1%. 40 × 1 ÷ 100 = 0.4 m, or 400 mm of fall. That is a grade of 1 in 40 ÷ 0.4 = 1 in 100. With an upstream invert level of 25.000 m, the downstream invert level is 25.000 − 0.400 = 24.600 m.

What this assumes

  • The pipe runs at one even grade from end to end.
  • The length is the horizontal distance. At pipe grades it is close enough to the length along the pipe.
  • Levels are in metres on the same datum, and can be below zero.

How Varicon helps

Keep a record of the pipe work as it goes in

The calculator checks fall and invert levels. Varicon does not set out pipes, but it keeps the record of the work: inspection forms, photos and notes in the site diary.

Inspection forms on site

Build inspection checklists without code, and your crew completes them on a phone with the location recorded.

Construction forms

Photos and notes in the site diary

Add photos of site conditions and progress, and notes on events, observations and conversations.

Site diary

Plant and labour on the job

Labour, equipment and materials recorded in the site diary flow into the job’s costs.

Cost management