Trench volume and backfill calculator
The outside diameter, not the nominal size.
The layer under the pipe, across the full trench width. Enter 0 for none.
Backfill
38.47 m³
- Excavated volume
- 45 m³
- Taken up by the pipe
- 3.53 m³
- Bedding
- 3 m³
- Spoil surplus
- 6.53 m³
Working: 45 m³ − 3.53 m³ pipe − 3 m³ bedding = 38.47 m³ backfill
Backfill38.47 m³
This is an estimate. Trench walls that slump or are over-dug, and spoil that bulks up, change the real volumes, so check them against your dockets.
How to calculate trench volume and backfill
Backfill = trench volume − pipe volume − bedding volume
The excavated volume is length × width × depth. The pipe takes up π × (outside diameter ÷ 2)² × length, and the bedding takes up length × width × bedding depth. The backfill is what is left: the excavated volume less the pipe and the bedding. If the spoil goes back in as backfill, the spoil left over is the pipe volume plus the bedding volume.
Worked example. A trench 50 m long, 0.6 m wide and 1.5 m deep, with a pipe of 300 mm outside diameter on 100 mm of bedding. Excavated: 50 × 0.6 × 1.5 = 45 m³. Pipe: π × 0.15² × 50 = 3.53 m³. Bedding: 50 × 0.6 × 0.1 = 3 m³. Backfill: 45 − 3.53 − 3 = 38.47 m³, leaving a spoil surplus of 3.53 + 3 = 6.53 m³.
These are solid volumes. Spoil bulks up once dug, so use the bulking factor when you plan trucks, and the compaction factor when you order imported backfill.
What this assumes
- The trench has vertical walls and an even width and depth along its length.
- One round pipe is laid along the full length. Bedding is under the pipe only. The haunch and side zones are counted as backfill.
- Every volume is a solid volume, in the ground or compacted. The spoil surplus assumes the spoil goes back in as backfill.
How Varicon helps
Track the trench and backfill costs as the work goes
The calculator gives the volumes to plan for. Varicon records the imported backfill as it arrives and costs the trench work against the budget.
- Backfill on a docket
Your crew captures the delivery docket on a phone as each load of backfill arrives.
- Plant and labour on the job
Labour, equipment and materials recorded in the site diary flow into the job’s costs.
- Actual cost against budget
Compare actual cost against budget by cost centre, resource type or accounting code.