Excavation volume calculator
X horizontal for 1 vertical, the same on all four sides. For a 1 in 1.5 batter, enter 1.5.
How much bigger the material gets when dug. Leave it blank for the volume in the ground only.
Volume in the ground
530.67 m³
- Loose volume once dug
- 663.33 m³
- Length at the top
- 24 m
- Width at the top
- 14 m
Working: 2 m ÷ 6 × (200 m² + 4 × 264 m² + 336 m²) = 530.67 m³, × (1 + 25%) = 663.33 m³ loose
Volume in the ground530.67 m³
This is an estimate. The real volume changes with uneven ground, over-digging and batters that are not cut true, so check it against your survey.
How to calculate excavation volume
Volume = depth ÷ 6 × (base area + 4 × middle area + top area)
With vertical sides, the volume is length × width × depth. Battered sides make the hole wider at the top than at the base. For a batter of 1 in X, each metre of depth adds X metres on each side, so the top is (length + 2 × X × depth) by (width + 2 × X × depth).
The calculator uses the prismoidal formula: depth ÷ 6 × (base area + 4 × middle area + top area). The middle area is the area halfway down. For a hole with the same batter on all four sides this gives the exact volume, where averaging the top and base areas would overstate it.
Worked example. A hole 20 m long and 10 m wide at the base, 2 m deep, with 1 in 1 batters. The top is 24 m by 14 m, or 336 m². Halfway down it is 22 m by 12 m, or 264 m², and the base is 200 m². 2 ÷ 6 × (200 + 4 × 264 + 336) = 530.67 m³ in the ground. With 25% bulking, that is 530.67 × 1.25 = 663.33 m³ loose.
The 25% bulking is an example figure, not the bulking of any particular material. Your geotechnical report or the material densities and bulking factors table is a better guide.
What this assumes
- The base is a flat rectangle and the ground at the top is level.
- Battered sides have the same batter on all four sides, written 1 in X for X horizontal to 1 vertical.
- The loose volume uses one bulking figure for the whole hole. Where the ground changes, work out each layer on its own.
How Varicon helps
Compare the dig you priced with what it is costing
The calculator gives the volume to budget for. Varicon records the plant and labour on the dig each day and costs it against the budget, so you can see where you stand.
- Plant and labour on the job
Labour, equipment and materials recorded in the site diary flow into the job’s costs.
- Actual cost against budget
Compare actual cost against budget by cost centre, resource type or accounting code.
- Each day in the site diary
Supervisors record labour, plant, weather and progress in the site diary, and the office sees it once it is submitted.