Spray seal quantity calculator
Litres per square metre, from your seal design. Use the same basis the design uses, hot or at 15°C.
Square metres covered by one cubic metre of aggregate, from your seal design.
Optional. Loose tonnes per cubic metre, for the aggregate weight.
Binder
Aggregate
- Aggregate weight
Working:
Enter these to see the result:
- Binder application rate
- Aggregate spread rate
ResultEnter 2 figures to see the result.
This is an estimate. The design rates, the surface texture and how evenly the sprayer runs change the real quantities, so check them against the seal design.
How to calculate spray seal quantities
Binder (L) = area × application rate, and aggregate (m³) = area ÷ spread rate
The binder is the area times the application rate, in litres. The aggregate is the area divided by the spread rate, in cubic metres. For the aggregate weight, multiply the cubic metres by the loose density of the aggregate.
Both rates come from your seal design, so the calculator leaves them for you to enter.
Example. These are round figures to show the sum, not rates for any seal. For 2,000 m² at a binder application rate of 1 L/m², the binder is 2,000 × 1 = 2,000 L. At an aggregate spread rate of 1,000 m²/m³, the aggregate is 2,000 ÷ 1,000 = 2 m³.
What this assumes
- One binder application rate and one aggregate spread rate apply to the whole area.
- The aggregate density is the loose density of the aggregate as delivered.
- No allowance is made for overlaps, edges or waste. Add your own.
How Varicon helps
Track binder and aggregate from order to job cost
The calculator turns your design rates into quantities. Varicon tracks what arrives against your purchase order and costs it to the job, so you can compare the seal with the budget.
- Deliveries captured on site
Your crew captures each delivery docket on a phone, and the cost is recorded against the job on arrival.
- One order, many deliveries
Raise one purchase order for the job and draw it down with several delivery dockets and bills.
- Actual cost against budget
Compare actual cost against budget by cost centre, resource type or accounting code.