Concrete volume calculator

Pour
m

m

mm

%

For spillage, uneven ground and what stays in the truck or pump. Adjust it to suit the pour.

Concrete to order

6.3 m³

Volume without waste
6 m³

Working: 10 m × 6 m × 100 mm ÷ 1,000 = 6 m³, × (1 + 5%) = 6.3 m³

This is an estimate. Uneven subgrade, formwork that bows and set-downs in a slab change the real volume, so check it against your supplier before you order.

How to calculate concrete volume

Concrete to order = length × width × depth, plus the waste allowance

Concrete is ordered by the cubic metre. Work out the volume of the pour, then add a waste allowance for what does not end up in the forms.

  • Slab. Length × width × thickness, with the thickness in millimetres divided by 1,000.
  • Strip footing. Length × width × depth.
  • Round piers. π × (diameter ÷ 2)² × depth for one pier, times the number of piers. The diameter is in millimetres, so divide it by 1,000 first.

Worked example. A slab 10 m by 6 m and 100 mm thick, with a 5% waste allowance. 10 × 6 × 0.1 = 6 m³. 6 × 1.05 = 6.3 m³ to order.

The 5% is a starting point you can change. Small or awkward pours, rough subgrade and pumping usually call for more.

What this assumes

  • Each slab, footing or pier has one even size from end to end. Work out thickenings, set-downs and pier heads on their own.
  • The volume of reinforcement is ignored, which errs on the side of ordering a little more.
  • The waste allowance is a starting point, not a supplier figure. Round the order to suit your supplier’s minimum and increments.

How Varicon helps

Know what each pour cost before the invoice arrives

Work out the cubic metres to order here. In Varicon, the concrete docket is captured on site and matched to your order, so the cost of each pour is on the job when the concrete arrives.

Concrete dockets captured on site

Your crew captures the delivery docket on a phone at the pour, with any supporting documents.

Delivery dockets

Purchase orders raised on site

Your field team can raise a purchase order for a specific job in the Varicon mobile app.

Accounts payable

Pour costs against budget

Compare actual cost against budget by cost centre, so you can see what the concrete on each job has cost.

Cost management