Civil construction cost management: getting back to basics
- Published
- Updated
- Reading time
- 3 min read

Running a civil construction business is hard at the best of times. More and more of our customers tell us they are unsure about the health of the industry. Private and government clients are cutting budgets, more contractors are tendering for less work, costs are rising and margins are being squeezed.
You can still survive, and even thrive. Our industry is cyclical. This is not the first downturn, it will not be the last and it will not last forever. Despite the short-term challenges, when this post was first published in October 2024, IBISWorld predicted growth of 2.5% for Australia’s civil construction industry over the next five years. With the right cost management, contractors can set themselves up for long-term success.
Now is the time to get back to the cost management basics we should follow in good times and bad. The difference is that in a hot market it is easier to get away with waste. These tips can help you hold your margins and come out the other side with a healthy, lean business.
Tip 1: Match your business structure to your work
With the wrong structure, you will struggle to compete with contractors who have the right one. Small jobs usually need fewer support resources and lower overheads. Larger jobs need more support and carry higher overheads. This is often a big factor in which opportunities you chase.
You may need to restructure to get a competitive cost base while keeping the right people for delivering projects well. A McKinsey study found that companies whose structures vary with project scale are more efficient and profitable. The right cost structure keeps you competitive, especially when tendering.
Construction tenders are mostly won on price. If it costs you more to deliver a job than your competitors, you start behind.
Tip 2: Play to your strengths
Jack of all trades, master of none.
If your business excels in a niche, focusing on it gives you an edge. Mastering a smaller niche lets you get very efficient and drive down your costs. You may also offer clients value beyond the lowest price, such as a unique solution or a shorter program, which can lift your tender ranking.
Tip 3: Know what you are signing up for
The devil is in the detail. When you consider a request for tender, check the contract terms. If the terms are unfavourable, your options are to allow for them in your price, declare an exclusion in your proposal, which may not be accepted, or not respond. Sometimes not responding is the best option.
A handy final check is to ask an AI assistant to assess the tender documents, if the tender’s confidentiality terms allow you to share them. Do not rely on it as your main check, because it sometimes makes things up.
Tip 4: Put proper governance in place
Without proper governance, you are almost certainly spending wastefully. Unnecessary purchases, buying from more expensive suppliers and overtime can blow a budget quickly.
Many of our customers came to us without a purchase order system. Purchase orders are a simple safeguard that check:
- the purchase is needed in the first place
- you are getting the best price
- it is approved at the right level.
This process alone can cut your costs considerably with little extra effort.
Avoidable overtime has a big effect on a project budget. A good system for keeping overtime down, and making sure any overtime worked is properly approved, will cut your project costs.
Tip 5: Run each project with an organised system
Half the battle is won before the job is awarded. The rest is in delivery.
A good delivery system means you deliver cost-effectively, find cost overruns early, identify and claim variations from scope, and avoid revenue slipping away.
You can run this with well-designed Excel templates, or with dedicated construction cost management software like Varicon.
If you do not have time to build a system in Excel, or you want a proven structure, book a demo and talk to us about your cost management.