Civil construction cost management: getting back to basics

Published
Updated
Reading time
3 min read
A compact track loader shaping a large earthworks pad lined with geotextile

Running a civil construction business is hard at the best of times. More and more of our customers tell us they are unsure about the health of the industry. Private and government clients are cutting budgets, more contractors are tendering for less work, costs are rising and margins are being squeezed.

You can still survive, and even thrive. Our industry is cyclical. This is not the first downturn, it will not be the last and it will not last forever. Despite the short-term challenges, when this post was first published in October 2024, IBISWorld predicted growth of 2.5% for Australia’s civil construction industry over the next five years. With the right cost management, contractors can set themselves up for long-term success.

Now is the time to get back to the cost management basics we should follow in good times and bad. The difference is that in a hot market it is easier to get away with waste. These tips can help you hold your margins and come out the other side with a healthy, lean business.

Tip 1: Match your business structure to your work

With the wrong structure, you will struggle to compete with contractors who have the right one. Small jobs usually need fewer support resources and lower overheads. Larger jobs need more support and carry higher overheads. This is often a big factor in which opportunities you chase.

You may need to restructure to get a competitive cost base while keeping the right people for delivering projects well. A McKinsey study found that companies whose structures vary with project scale are more efficient and profitable. The right cost structure keeps you competitive, especially when tendering.

Construction tenders are mostly won on price. If it costs you more to deliver a job than your competitors, you start behind.

Tip 2: Play to your strengths

Jack of all trades, master of none.

If your business excels in a niche, focusing on it gives you an edge. Mastering a smaller niche lets you get very efficient and drive down your costs. You may also offer clients value beyond the lowest price, such as a unique solution or a shorter program, which can lift your tender ranking.

Tip 3: Know what you are signing up for

The devil is in the detail. When you consider a request for tender, check the contract terms. If the terms are unfavourable, your options are to allow for them in your price, declare an exclusion in your proposal, which may not be accepted, or not respond. Sometimes not responding is the best option.

A handy final check is to ask an AI assistant to assess the tender documents, if the tender’s confidentiality terms allow you to share them. Do not rely on it as your main check, because it sometimes makes things up.

Tip 4: Put proper governance in place

Without proper governance, you are almost certainly spending wastefully. Unnecessary purchases, buying from more expensive suppliers and overtime can blow a budget quickly.

Many of our customers came to us without a purchase order system. Purchase orders are a simple safeguard that check:

  1. the purchase is needed in the first place
  2. you are getting the best price
  3. it is approved at the right level.

This process alone can cut your costs considerably with little extra effort.

Avoidable overtime has a big effect on a project budget. A good system for keeping overtime down, and making sure any overtime worked is properly approved, will cut your project costs.

Tip 5: Run each project with an organised system

Half the battle is won before the job is awarded. The rest is in delivery.

A good delivery system means you deliver cost-effectively, find cost overruns early, identify and claim variations from scope, and avoid revenue slipping away.

You can run this with well-designed Excel templates, or with dedicated construction cost management software like Varicon.

If you do not have time to build a system in Excel, or you want a proven structure, book a demo and talk to us about your cost management.

How Varicon helps

Approval limits and an organised system for every job

Tips 4 and 5 ask for proper governance and an organised system on each project. In Varicon, approvals are set by role and dollar limit, hours are approved on each project, and every job is tracked against its own budget.

Approvals by role and dollar limit

Set approval workflows for purchase orders and bills, so spending follows your rules.

Accounts payable

Timesheet approvals per project

Choose who approves timesheets on each job, so hours are checked before they reach payroll.

Timesheets and payroll

Every job against its budget

Every cost item is assigned to a project and tracked against that project’s budget.

Cost management

  • Guide

    Managing job costs on civil construction projects

    Break each job into cost codes, capture labour, plant and materials against them every day, count supplier costs when the goods arrive, claim every variation, and use what each job teaches you in your next tender.

  • Guide

    Purchase orders and supplier bills for civil contractors

    Put each order in writing with a purchase order, check every delivery against its docket, and match each supplier bill to both before you pay it. Start simple, and add approvals as the business grows.

  • Glossary

    Purchase order

    A purchase order (PO) is the document a buyer sends a supplier or subcontractor to order goods or services. It sets out what is ordered, the quantity, the price, delivery and the terms.

  • Glossary

    Margin erosion

    Margin erosion is the gradual loss of the profit margin on a job, as costs creep above what the price allowed for, often in small amounts that are not noticed until the job is finished.

  • Article

    Lean civil construction management: a simple guide to better operations

    What lean civil construction management is, the benefits, how to spot waste in your business and how to put improvements in place.

  • Article

    5 best practices for managing tenders in civil construction

    Five tendering habits for civil contractors: find every opportunity, pick the right jobs, meet the criteria, submit cleanly and follow up.

Site-proof civil software

See how Varicon would work on your jobs

Show us how your crew and office work today. We will show you how hours, dockets and variations flow through to payroll, claims and job costs.