5 best practices for managing tenders in civil construction
- Published
- Updated
- Reading time
- 4 min read

Talking with our civil customers and at industry events in mid-2024, one topic came up again and again: the slowdown in new construction work in both the public and private sectors.
After a period of historically high activity, civil contractors need best practice in every part of the business, including tendering. Whether you are feeling the pinch yet or not, these tendering habits will help you run a more profitable business.
Tip 1: You have to be in it to win it
It sounds obvious, but if you are not systematic about finding tender and quote opportunities, many of them are passing you by. Where you find tenders depends on who releases them, for example:
- federal, state and local government
- utilities, such as water, sewerage, power and gas
- property developers
- head contractors.
Large tenders
Larger tenders normally go through a public tender process. Smaller tenders usually do not need to be public, and very small jobs often go through tender panels. The value at which a tender must be public is set by each buyer’s own rules, so check the tender documents.
Public tenders are listed on AusTender, state eTendering portals and private tender aggregator services, and often in local newspapers.
Most organisations publish their tendering policies on their website, or will give them to you if you ask. Subscribe to the services your target customers use to publish tenders, so you hear about upcoming work.
Small tenders and quotes
Hearing about smaller projects is harder. Depending on the size of the job, the client may only need between one and three competitive bids. If they do not invite you, you will probably never know the job existed.
This is where being proactive pays. If you have a great relationship with the client, are based nearby and have delivered good results before, they may come to you. If not, there are still steps you can take.
The key is to stay front of mind. If you are not yet working for an organisation you want to work for, they need to know you exist, that you have the capability and that you want their work. Dropping by their office or making a phone call is often enough. If you call once a month to ask what work is coming up, most organisations will tell you. That lets you focus on those opportunities and get invited in the first place.
A word of warning: this only works if you do it consistently. Many contractors fall into the trap of chasing work only when they are quiet, and dropping it when they are busy. The most successful contractors set aside time for it however busy they are. If you cannot keep it up, consider bringing a salesperson onto the team.
If you are organised, you can track this in a spreadsheet. Customer relationship management (CRM) software can also help.
Very small jobs and panel tenders
For many civil contractors, panel tenders are a great source of baseline work. On a panel, the principal can engage you on hourly rates without running a full procurement process each time.
Tip 2: Tender for the right jobs
Not all tenders are equal. If you are good at finding opportunities, you will probably find more than you can, or should, tender for, even in a slow market.
When deciding what to tender for, ask:
- Can you win at a price that gives you an acceptable margin?
- Do you have a strong track record with this organisation that improves your chances?
- Does it play to your capabilities?
- With limited time to prepare tenders, is this the best project to spend it on?
Bidding on the right jobs gets the most from every hour you spend tendering.
Tip 3: Know the tender criteria
You can put together a great tender at a great price and still lose if it does not line up with the tender criteria.
At a CCF Victoria event, the City of Greater Geelong made the point that many criteria are assessed without looking at the price. If you do not meet a minimum threshold, your price will not even be considered. Even when it is considered, price is just one of many weighted criteria.
The better you understand the criteria, and the more closely your response addresses them, the higher you will score. Ironically, adding extra bells and whistles that the tender did not ask for can lower your score.
Tip 4: Practise good tender hygiene
It should not need saying, but many tenders have formatting problems, go through the wrong channel, contain spelling mistakes and generally show a lack of care.
Keep your tenders simple, short and well presented. Take the time to make sure they show your company at its best.
Tip 5: Follow up after the tender
This step is rarely taken, and it can be one of the best uses of your time. Win or lose, ask for feedback on your submission.
Depending on the organisation and the value of the tender, there may be limits on what they can tell you. Usually you can find out the winning tender value and where your submission was weak.
If you win, it helps to know how much lower your bid was than the others, so you are not underpricing, and what stood out in your response.
This last step helps you sharpen every tender after it.
Once you win the work, the margin is made or lost in delivery. See how Varicon helps you track job costs against budget, or book a demo.