Lean civil construction management: a simple guide to better operations

Published
Updated
Reading time
3 min read
Three tractors with trailers, a telehandler and a ute on a graded site at dusk, with a small group of workers in hi-vis

Varicon exists because of a problem many owners and managers of civil businesses know well: chasing your own tail.

  • The information you need is not to hand.
  • By the time you find an operational problem, it is too late to fix it.
  • Getting data from the job means driving to site, and what you get is often wrong, incomplete or inconsistent.
  • The same data gets typed into several different systems.

Fixing that is where lean civil construction starts. The costs are real, as any business owner knows.

What lean civil construction management means

Lean is about removing waste, any kind of waste, including processes that are inefficient or unnecessary.

Think about how much time your team spends on the problems above. That time could go into work that earns revenue and grows your business. And it is not just the time spent managing processes. There is also the waste of making the wrong decision, or the right decision too late, because you do not have an accurate picture of how the business is performing.

Lean construction has become a buzzword, and it is easy to dismiss it as consultant talk. In reality the principles are simple, and you almost certainly follow some of them already without thinking about it. The trick is to be a bit more deliberate about finding the opportunities. Small changes pay off, because they apply to tasks you do over and over.

The benefits of lean civil construction

Construction has a reputation for waste and inefficiency. Applying lean principles can help you:

  • get more done with fewer people and less equipment
  • lower stress in your team
  • make the business easier to manage
  • scale the business
  • present a more professional business to the market.

Identify the waste

Start by finding the waste you can remove. Do not only think about physical waste. Waste is anything that has a cost nobody is prepared to pay you for.

A few examples from construction, and you can probably name many more:

  • Buying materials before they are needed. This stretches the time between money going out and money coming in.
  • Entering the same information in several places. For example, typing timesheets into payroll, then into the site diary and a cost tracking spreadsheet.
  • Waiting for information. Paper documents sent to the office, or waiting for someone to email the details.
  • Finding cost overruns too late. For example, a crew not being run efficiently, or site delays from poor coordination.
  • Slow progress claim approvals because the supporting documents do not line up.

Put the improvement in place

The goal is to put systems, processes and documentation in place that remove waste from your business.

Documentation makes sure your new, less wasteful process is understood and shared with your team. Ideally, display it where the work happens. If that is not practical, train your team on it.

All of your work is part of a workflow. Mapping your workflows shows where they can be improved. Start with the easy wins and keep improving.

Many of these processes can be automated. Software is replacing manual effort in every industry. Your options are a generic system where you build your own workflows, custom software built for your business by a developer, or a system designed for your industry, like Varicon.

The cultural shift

Lean should not only come from the top. It works best when everyone in the business is involved, because many of the opportunities are spotted by front-line workers. Expect better engagement, better morale and better staff retention.

Ready to start?

A healthy, lasting business keeps looking for waste and removing it.

Varicon is built on lessons from many civil businesses like yours, so much of the groundwork for a leaner way of working is already done. If you want to start in your business, book a demo.

How Varicon helps

Cut the double handling between site and office

A lean business stops entering the same information twice. In Varicon the site diary fills in from timesheets and delivery dockets, and what your crew logs becomes job costs without retyping.

Hours approved once, used twice

Approved hours flow to payroll in your accounting system and onto the job’s costs.

Timesheets and payroll

A diary that starts filled in

Labour hours come from timesheets and materials from delivery dockets, so your supervisor adds the rest.

Site diary

Overruns seen while the job runs

Compare actual cost against budget as the work happens, not after the job has moved on.

Cost management

  • Guide

    Managing job costs on civil construction projects

    Break each job into cost codes, capture labour, plant and materials against them every day, count supplier costs when the goods arrive, claim every variation, and use what each job teaches you in your next tender.

  • Glossary

    Margin erosion

    Margin erosion is the gradual loss of the profit margin on a job, as costs creep above what the price allowed for, often in small amounts that are not noticed until the job is finished.

  • Article

    Civil construction cost management: getting back to basics

    Five back-to-basics cost management tips to help civil contractors hold their margins and build a lean business through a downturn.

  • Article

    Going from employee to owner in civil construction

    Thinking of going from employee to owner in civil construction? Plan, start small, get your finances and systems right and find a mentor.

  • Article

    Celebrating Women in Construction Week 2024

    Why Women in Construction Week matters and practical ways construction companies can support women, from hiring and mentoring to safe sites.

Site-proof civil software

See how Varicon would work on your jobs

Show us how your crew and office work today. We will show you how hours, dockets and variations flow through to payroll, claims and job costs.