Why cost cutting is not the answer to civil construction cost management

Published
Updated
Reading time
3 min read
A worker in hi-vis in front of a large orange excavator on an urban site beside a motorway overpass

It is no secret that construction is going through a very difficult time. There is plenty of civil and infrastructure work, but the cost of delivering it is rising sharply.

Most of our customers tell us they are struggling to run profitable jobs in the current market. Some factors are out of your control, such as rising costs and what your competitors bid. But some things you can control, and they can make a big difference to your profit and your financial risk.

The temptation is to cut every cost you can. That is understandable, and many costs should be cut. But cutting blindly can backfire and cost you more, in the short term and the long term. A better approach is cost optimisation: recognising how the parts of your business depend on each other, and that sometimes you need to spend money to save money.

This article covers the cost management steps you can take for the things you control.

The usual response

The usual response from contractors is to cut every “non-critical” expense. That makes sense if the spend is not producing revenue or savings. But over the last two decades, construction contractors have neglected the investment needed to improve productivity.

Comparing construction with other industries, and with manufacturing in particular, shows why.

Investment in technology

This is construction’s catch-22. Margins are low, so there is little spare cash for technology. There is little investment in technology, so efficiency stays low. Efficiency stays low, so margins stay low, and the cycle repeats.

Construction has one of the lowest rates of technology investment of any industry. The average across all industries is 3.5% of revenue. Construction invests about a third of that, at 1.2%.

By treating technology as a discretionary spend, construction has missed out on the big drop in costs seen in industries like manufacturing.

Productivity

Much of construction’s cost problem comes from low productivity. Outside construction, the last two decades brought big gains in efficiency and productivity from the right use of technology.

Across all industries, productivity rose 25% on average. Manufacturing was one of the leaders, with a 60% increase. Construction sits at the other end, with one of the lowest increases of any industry, at just 5%.

Cost cutting has not fixed this so far, and it will not fix it now. Rather than treating cost cutting as the goal, take a long-term view, as the leaders in construction and other industries do. That serves you now and even better in the future.

What to do today

When you optimise costs, make sure you can ride out short-term conditions and still be set up to grow profitably.

Audit your business with three questions.

1. Which expenses are not giving the business a return?

These are the expenses you can safely cut.

2. Are you hitting your productivity targets?

For civil contractors, the biggest cost to cut is low productivity: too many labour and equipment hours going into a fixed amount of work.

3. Do you have the right systems in place?

Without the right systems, it is hard or impossible to spot productivity problems and cost overruns until it is too late. Those inefficiencies almost always cost many times more than the right systems would.

This simple audit lets you optimise your costs with confidence. In some places, you cut expenses knowing it will not hurt the rest of the business. In others, you invest in systems that lift productivity and show cost overruns early. For most civil contractors, that is where the real savings are.

If you want to work more efficiently and see where you stand on every job, book a demo and talk to us about cost management.

How Varicon helps

Check where the money goes before you cut

Before you cut, this post asks whether the job is going to plan. Varicon shows the costs your crew logs on site against the budget, so you can see where the money is going.

Costs against budget

Hours, site diaries and deliveries become job costs as they are logged, compared with the budget.

Cost management

Plant and labour on the job

Labour, equipment and materials recorded in the site diary flow into the job’s costs.

Cost management

WIP and actual versus budget reports

Run WIP and actual versus budget reports, and export them to a spreadsheet to share.